Permitting is where solar jobs go to stall. This is how you see it before it does.
A solar or reroof permit can sit in six different states between submission and final sign-off, and every AHJ moves at its own pace. Without a board tracking that, the only way to know where a permit stands is to call the county — and by the time someone does, the job has usually been stalled for a week.
SolarProjeX's Permit Board tracks every permit by stage — Needs Permit, Design/Engineering, Permit Applied, Permit Issued, Permit Mailed, and more — with the real date it moved and who moved it, plus stall warnings that surface anything sitting too long. A reroof carries the roof permit and the solar permit side by side, since they rarely move together.
What it does, point by point
- Permit status tracked by stage, by AHJ, with the real date it last moved
- Stall warnings surface permits that have been sitting too long, sorted by days-in-stage
- Multiple permit types on one job — a reroof carries roof and solar permits side by side
- Filterable by county, assignee, and job-scheduled status
- Board and list views, so the office can work it however fits